Remodeling - Day 4

Roxy at Doggy Daycare in Minneapolis Wow, Lots has changed in Waggers Way doggy daycare room in the past few days.  Sunday, the final touches were finished on the floor, and this morning we were able to walk on it.  At 7:30 this morning, the painting started.  Wow, does it look fresh and new! Tomorrow, the work on the ceiling starts.  We took Roxy in the room and she really liked the floor.  When we first opened, rubber flooring was the industry standard and the best that was out there.  After almost 4 years, the standards have changed, and rubber flooring is a great option, but not the best (in my opinion) which is why we have decided to update it.  We are putting down a rubberized epoxy which is 5 times easier to clean and the dogs really love it! m This room looks so empty with everything moved out of it.  Crazy!! If all goes well this doggy daycare room should be up and running by Friday, then we will start the Ruff House.

Thanks again for being so understanding with us during this time, construction is always hard, but we try to make it as easy on everyone as possible.

Keith